Q: My wife had 3/8″ ***** (cheaper) engineered hardwood installed in a bedroom, but it was laid with the joists, instead of across. I am now putting in the same product in another bedroom and hallway and will be laying it perpendicular. Can I remove and re-lay the before mentioned bedroom without ruining it?
I think it was stapled.
A: Not likely.
Related Questions
Installing salvaged old hardwood strip flooringI took out some old hardwood strip flooring from a renovation job and pulled out the nails from the back and plan on cutting out the damaged wood and re-installing the good wood in my home. I have put down a tongue and grove plywood subfloor and am wondering if…
Glue on back of salvaged woodI have removed some oak flooring from a renovation job in a house and plan on installing it in my house. I have removed all the nails from the back but there is some glue on the the back which is sometimes hard and sometimes brittle. What is the best…
Installing wood, over cement, that's over wood?We have a wood floor covered in a cement slush which is about an inch thick. We want to go over the cement since it has asbestos glue on the cement. The two contractors we've spoken to are encouraging us to put down plywood and then solid hardwood on top…
Customer insists on installing real wood in basementQ: I have a very good customer of mine that is adamant about installing unfinished oak strip 4' x 3/4' in a basement. I have advised him to use laminate in this situation, however he wants real wood. What is the best method to install a plywood sub-floor for real…